Event List View

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Capital Investment Committee

01.         Call To Order

02.         Approve Minutes Of May 28, 2014

03.         Consideration of Change Order No. 1 (Final Change Order) for the 7th Avenue/Fair Street Intersection to 5th Avenue North Sanitary Sewer Improvements Project (COF Contract No. 2012-0193)
David Parker, City Engineer/CIP Executive

 

04.         Consideration of Change Order No. 1 (Time Extension Only) to the Contract with Brown Builders, Inc. for the Construction of Intersection Improvements at Wilson Pike (SR-252) and East McEwen Drive (COF Contract No. 2012-0145)                                                    
David Parker, City Engineer/CIP Executive

05.         Consideration of Amendment No. 1 to the Professional Services Agreement with Smith Seckman Reid, Inc (COF Contract No. 2012-0189) for Limited Construction Engineering and Inspection Services on the Hillsboro Road Improvements Project.                
David Parker, City Engineer/CIP Executive

06.         Street Projects’ Status Reports:

A.           Mack Hatcher Parkway Northwest Extension

B.           Mack Hatcher Parkway Northeast Widening

C.           Hillsboro Road Improvements (SR 96 West To Independence Square)

D.           Hillsboro Road Improvements (Independence Square To Mack Hatcher Pkwy)

E.            McEwen Drive Temporary Connector

F.            McEwen Drive, Phase IV Improvements, Cool Springs Blvd to Wilson Pike, Professional        Design Services

G.           3rd Avenue North Extension

H.           Carothers Parkway South Extension

I.             McEwen Drive And Wilson Pike Intersection Improvements

J.            Century Court/Beasley Drive Connector 

K.            Hunter’s Bend Safe Routes To School

L.            Columbia Avenue Improvements, Downs Blvd to Mack Hatcher Parkway

M.          Sidewalk Construction along Highway 96 West

N.           Sidewalk Construction along Murfreesboro Road (SR 96 East), Pinkerton Park to Mack     Hatcher Parkway

O.           Franklin Road (Harpeth Bridge to Harpeth Industrial Court)

07.         Water Management Projects’ Status Reports

A.           I-65 Goose Creek Utility Relocation

B.           11th Avenue Improvements

C.           North Petway Sewer Rehabilitation

D.           Spencer Creek Basin – South Prong Interceptor Upgrade

E.            Charlton Green Sanitary Sewer Improvements

F.            Spencer Creek at Franklin Road Sewer

G.           SE Basin Study

H.           Curd Branch and Watson Branch Interceptor Sewer

I.             Fieldstone Farms Pump Station No. 1 Rehabilitation

J.            Sanitary Sewer System Model and Capacity Assurance Tool – Phase 1

08.           Stormwater Projects’ Status Reports

A.         Jackson Lake Dredging Improvements

B.         Ralston Creek (Victoria Court) Stream Restoration

C.         100-Block Battle Avenue Drainage Improvements

D.         Figures Drive and 400-Block Avenue Drainage Improvements

E.          Ralston Creek (Cheswicke Farms) Stream Restoration

09.         Other Business

10.         Adjourn

                                                                                                         Respectfully Submitted,

                                                                                                         Eric S. Stuckey,

                                                                                                         City Administrator

Return to full list >>

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer